"The most significant improvement for the Steel Group that DBR+™ has given
us is total visibility of our facility from one end to the other end. And its visibility
is not just limited to a few select individuals, but every employee in the Steel
Group. We now manage from a proactive style rather than a reactive style due to
the increased visibility. Recently, we had one area go down for three days, but
the visibility provided by DBR+™ allowed us to effectively manage our resources,
and recover very rapidly. DBR+™, we would have just sunk in the quagmire of
stacked product and confusion."
Dave Blazek, VP & GM Steel Group
LeTourneau Technologies, Inc.
"It has brought us an electronic way to manage and execute DBR. It gives us the
ability to see exactly what’s going on in all facets of the schedule and shop floor
for anyone with the Web access. We have reduced our WIP, increased our on time delivery
throughout the company, and have a very proactive way to see disruptions before
they hurt us. It gives us an improved way to prioritize what to work on when and
where to utilize our under-loaded resources. We look forward to doing more process
improvement as a result of the reason code analysis capabilities."
Todd Colyer, Materials Manager
Romac Industries
"It’s amazing how well this system works. The chaos and firefighting have settled
down, we’ve found new capacity, Jason and I are caught up and looking for things
to do."
David Arnold, Production Manager
Royal Plastic Mfg., Inc
"Last year, I did not believe that there was such a thing as hidden capacity. My
perspective was that we were very good at what we did. We always were getting incrementally
better and there was no room for significant improvement without additional resources.
In general, due to the implementation of DBR+™, we have been able to increase
throughput and pass a large amount of work through the shop to satisfy past due
needs of our customers. We also have found room to take all new jobs that show up.
Rather than react to each customers’ urgent need for the week, we are able to take
a look at monthly needs, adjust resources and execute a plan."
John Bressoud, Vice President
Turbocam
"DBR+™, after we implemented it, helped us identify our priorities and manage the
flow through the facility. One of the biggest gains – our lead time used to be three
weeks and we brought our lead time down to three days and if we have an expedite
we can get a product through the facility in 6 hours."
Tom Lochman, Foundry Manager
Romac Industries
"DBR+ resulted in a pretty dramatic increase in our ability to get product through
the shop. Our on-time deliveries were in the 65 to 75% range and now above 98% without
even thinking about it. The flow through has been terrific. The work in process
inventory is dramatically down."
Andrew McCartney, President
Bowden Manufacturing
"Through real-time visibility and tracking of WIP using DBR+™ TFA has been able
to see through the confusion of operating at maximum capacity to capture opportunities
to satisfy customers in urgent need. We also are given a real-time picture of our
current capacity status, enabling us to communicate with our customers our true
capabilities in regards to their ordering needs."
Wally Browning, Materials Manager
Tube Forgings of America